Hammer crusher operation method

1, hammer crusher before starting to work
A. check whether there are lubricant.
B. check all fastener tighten whether completely.
C) the check whether a metal or other easily broken.
D. check with the hammer the gap between is normal or not.
E. by hand, observe whether the rotating rotor. Rotation direction correctly, hammer and other parts whether collided.

2.hammer crusher starting

A. the check, machine and transmission parts may be normal, starting conditions.
B. if starting current abnormal condition backwardness, should stop moving. Must ascertain and eliminate abnormal condition, can again after starting crusher.

3.hammer crusher  useing

A. crusher normal operation, and then after feeding.
B. must add broken evenly distributed in the material, and work on the part of the rotor, in order to prevent the motor load rising.
C. regularly check the situation, if have blocked should immediately.
D. bearing in normal working circumstance temperature in 35 ° c, should, within the scope of the highest temperature should not be more than 70 ° c. If more than 70 degrees should stop immediately and find out the reason to eliminate them.
E. parking before release for work, should stop breaking indoor material completely broken before closing motors.

Clirik Company © 2000-2010 All rights reserved. E-mail: sales@clirik.com Tel:0086-21-20236178 沪ICP备09056488号-1 About Us | Products | News | Email |