Jaw Crusher Maintenance And Using

1,The normal jaw crusher operation, and then begin to feed stone.

2, Breaking the material should be uniform to join the crushing chamber, feeding should be avoided to prevent a sudden increase in load or unilateral mutations.

3, Under normal circumstances, the bearing temperature rise should not exceed 35 ℃, the maximum temperature rise does not exceed 70 ℃.

4, In use, Ruoyin crushing chamber materials, blockage caused by the parking should be immediately shut down the motor, material must be removed first Ti and then restart.
 
 
Clirik Company © 2000-2010 All rights reserved. E-mail: sales@clirik.com Tel:0086-21-20236178 沪ICP备09056488号-1 About Us | Products | News | Email |